ECOBAC 240 and 360: waste collection integrated into public space
ECOLLECT buried solutions place the container below street level while keeping deposit access at the surface through a chute. Two configurations: food waste on one hand, litter from pedestrians on the other.

Article contents
When the bin becomes part of the urban project
In historic centres, pedestrian areas, seafronts and tourist destinations, the repeated presence of conventional bins can take up space and interfere with the image and usability of the surroundings. Underground collection changes how waste is stored: depositing remains accessible at street level, while the container sits below the road surface. What remains above ground is the hopper and the finish platform.
The ECOBAC range from ECOLLECT applies this principle in two different configurations: ECOBAC 240, presented for food waste, and ECOBAC 360, a street basket for waste produced by pedestrians. They are not simply two sizes of the same bin: the type of deposit and the context of use differ.
See the ECOBAC 240 and 360 technical overview for the Italian market.
How an underground platform works
The user deposits waste through a hopper at street level. The material reaches the underground container. For emptying, the operator activates the lifting system, brings the container to an accessible position, empties it and places it back in the pit.
For ECOBAC 360 ECOLLECT specifies a professional battery-powered drill connected to a dedicated rod, with trigger control and a torque limiter. For ECOBAC 240 the manufacturer specifies a portable motor to reach the 240-litre wheeled bin. Operating methods should therefore be considered separately.
The absence of a fixed hydraulic power unit can simplify infrastructure, but trained operators, space for extraction and safety and maintenance procedures are still required. The sequences are illustrated in the official product sheets forECOBAC 240andECOBAC 360.
ECOBAC 240: an underground point for organic waste
ECOLLECT presents ECOBAC 240 for underground collection of food waste. The configuration houses a 240-litre wheeled bin; at surface level there is a 60-litre ergonomic polyester hopper with a drawer that facilitates depositing and cleaning. The two capacities should not be confused: 60 litres refers to the hopper, 240 litres to the bin.
The container incorporates a third wheel that, according to the manufacturer, makes rotation and handling easier. Ecostop, an anti-overflow system that locks the drawer when the bin is full, is also available. The function can help avoid deposits when there is no remaining capacity, but requires correct configuration and maintenance.
The pit is made of steel and is intended for stable ground that is not prone to flooding; the platform is non-slip polyester. ECOLLECT describes the hopper as suitable for people with reduced mobility, but accessibility of the complete installation must be verified at the design stage.
ECOBAC 360: a 360-litre street basket
ECOBAC 360 is a high-capacity basket for litter from walks, designed for pedestrian streets, parks and gardens. The stated capacity is 360 litres. The Visio hopper is stainless steel; the deck is polyester and the pit is galvanized steel.
According to the manufacturer's datasheet, the hopper measures 445 × 255 × 1,000 millimetres. ECOLLECT describes it as suitable for people with reduced mobility and offers RAL finishes on request. As with the 240 model, accessibility of the entire installation must be verified on site.
For emptying, a professional battery-powered drill connected to a rod with a torque limiter raises and lowers the container. The container is brought to an accessible position, extracted, emptied and replaced. Space for handling and maintenance must therefore be planned. The model can be assessed for promenades, squares, tourist areas and parks, where a spacious basket must integrate with street furniture.
From early installations to documented projects
According to the account published by ECOLLECT, the first ECOBAC installation dates to 1999 in Carpentras; the first ECOBAC 360 would have been installed in 2002 at Pont du Gard. These are dates stated by the manufacturer.
In itsprojectssection, the company lists projects in cities such as Aix-en-Provence, Périgueux, Montargis, Antibes and Redon, in prestigious sites such as Monaco, Montpellier, Château de Chambord and Pont du Gard, and in coastal locations such as La Seyne-sur-Mer, Hendaye and Cannes. The page does not always link each project to a specific model or quantity: the locations should therefore be presented as ECOLLECT references, not as certified installations of ECOBAC 240 or 360.
Administrative confirmation comes from Pélissanne: the municipal minutes of 26 September 2024 record a three-year scheduled maintenance contract with ECOLLECT for five ECOBAC units: maintenance should be included in lifecycle cost. The document does not specify the models and does not represent the purchase price, but confirms that scheduled maintenance is a cost item to plan for.
Benefits for appearance and urban organisation
The most immediate benefit is reduced visual clutter: the collection point develops mainly below street level and the surface can look tidier, especially in historic centres, squares, parks and tourist destinations.
When correctly sized, the solution defines a deposit point without leaving a conventional bin exposed. Hopper and finishes can be coordinated with paving and other elements of street furniture. The citizen uses the upper part, while the operator works on the container during emptying: a distinction that can make the point neater, without removing the need to clean and monitor the surrounding area.
In the case of ECOBAC 360, battery operation avoids a fixed hydraulic unit in the pit. It is an element of construction simplicity, but still requires dedicated equipment and procedures. Value for money must be assessed across the full process.
Savings: assessing cost over the life cycle
An underground container does not automatically reduce collection costs or the number of emptying runs. ECOBAC 240 houses a 240-litre bin and ECOBAC 360 has a stated capacity of 360 litres: frequency depends on the waste actually produced, seasonality, user numbers and fill level.
Value for money should therefore be assessed by comparing total cost over time with the conventional solution. TheEuropean Commissionstates that life-cycle cost can include purchase, delivery, installation, use, maintenance, spare parts and end of life. For an underground platform the calculation should cover excavation and reinstatement, any underground services, supply, lifting equipment, labour hours, cleaning and maintenance. Benefits to measure include recovered surface area, reduced clutter and impact on service organisation.
In Pélissanne, the municipal minutes of 26 September 2024 record a three-year scheduled maintenance contract with ECOLLECT for five ECOBAC units: maintenance should be included in lifecycle cost (document). The figure is not a purchase price and cannot be transferred to other authorities: the minutes do not specify models, visits or services included. It is nevertheless a concrete example that maintenance must appear in the financial plan.
The solution is worthwhile when the value gained in public space and collection organisation justifies investment and recurring costs. Improving appearance can be a concrete objective even without a direct reduction in emptying frequency.
Installation: checks before choosing
Burial requires a site assessment: underground services, ground stability, water table or flood risk, paving levels and water management. For ECOBAC 240 ECOLLECT specifies a steel pit for stable, non-floodable ground; for ECOBAC 360 it describes a galvanized steel pit. Compatibility must be confirmed with installation documentation and on-site checks.
Space must also be reserved to lift, extract and replace the container, as well as for maintenance. On narrow pavements and in very busy areas, operations must be organised so as not to interfere with pedestrians. Accessibility, cleaning and inspectability must be considered from the design stage. A site visit with the collection operator is essential to verify that model, location and capacity suit the intended use.
A possible evolution of the urban bin
ECOBAC 240 and 360 represent a clear direction: place collection volume below street level and design more carefully what remains visible. The future of underground systems will depend on the ability to integrate them with real flows, ensure maintenance and measure actual costs.
The choice is not to bury every bin, but to identify places where this solution delivers a verifiable advantage. ECOBAC 240 and 360 offer two different configurations: one for proximity collection of food waste, the other for litter in public spaces. The outcome depends on sizing, site design and management over time.
Frequently asked questions about ECOBAC 240 and 360 systems
What is the difference between ECOBAC 240 and ECOBAC 360?
ECOBAC 240 houses a 240-litre wheeled bin and is presented by ECOLLECT for food waste collection, with a 60-litre ergonomic hopper. ECOBAC 360 is a 360-litre street basket for litter on pedestrian streets, in parks and gardens.
How does emptying work?
The container is brought to an accessible position via a lifting system. For ECOBAC 360 the manufacturer specifies a professional battery-powered drill connected to a rod with a torque limiter. For ECOBAC 240 it specifies a portable motor. The container is then extracted, emptied and placed back in the pit.
Can ECOBAC systems be installed anywhere?
No. Ground conditions, underground services, flood risk, levels, accessibility and space for extraction and maintenance must be verified. ECOLLECT indicates for ECOBAC 240 a steel pit suitable for stable, non-floodable ground. Feasibility must be confirmed with a site visit and the model's technical documentation.
Do underground platforms always save money?
Not automatically. The outcome depends on installation cost, collection frequency, labour hours, maintenance and the value placed on better integration of public space. The assessment should compare costs over the full life cycle with those of the conventional solution.