WasteMate smart compacting bins: how they work, where they were installed and what benefits they offer
Internal compactor, solar power and remote monitoring: documented experiences in Italy and Europe show how the technology can help manage high-traffic collection points.

Article contents
On commercial streets, in squares and in tourist areas, street bins can fill up within a few hours. Without fill-level information, operators must rely on scheduled checks and routes, risking intervention too early or too late.
Smart compacting bins combine a compactor that reduces the volume taken up by waste and sensors that signal when the container nears its fill threshold. WasteMate adds solar power on outdoor versions and a remote monitoring platform. Documented installations in Italy and across Europe help show where this technology has been trialled and which aspects to assess before adoption.
See WasteMate specifications in Italian.
What is WasteMate
WasteMate is a line of smart compacting bins developed by the Dutch company WasteMates B.V., formerly known as Procomat. On 5 November 2025 Traflux, a Belgium-based group, announced the acquisition of WasteMates B.V. and the transfer of design, production and distribution of the line into its portfolio. [1]
The system integrates an outer housing, an electric compactor and a standard wheeled bin. Users deposit waste through the flap; the compactor reduces the volume of material in the inner container, allowing available capacity to be used for longer. On outdoor versions a photovoltaic panel powers the system together with a battery. Sensors and GPS location transmit information to CleanCityManager.
The WasteMate 120 accommodates a 120-litre wheeled bin; the WasteMate 240 is designed for a 240-litre container. The manufacturer states sensors and GPS on both versions. The actual configuration, including options and accessories, must be confirmed in the supply technical data sheet. [2][3]
How the compactor and solar power work
In the WasteMate 120 the compactor is electric linear. The technical data sheet lists a 12 V 40 Ah gel battery, system power of 115 W and a 30 W solar panel. The body is powder-coated steel, with a 316 stainless steel hopper and 304 stainless steel base. Deposits can be made via a foot pedal. [2]
For the 120 model, the manufacturer states a compression ratio above 5:1 for general waste and above 8:1 for fast-food waste. On the data sheet these values correspond respectively to more than 600 and 960 litres of compacted volume. For the WasteMate 240 the stated values are more than for general waste and more than 1,920 litres for fast-food waste. [2][3]
However, the maximum ratio should not be read as guaranteed capacity for every type of waste. Results depend on the nature of the material, the shape of items deposited and operating conditions. A savings estimate based solely on the maximum compression figure can therefore be misleading. Before choosing a configuration, compatibility with collected fractions and service procedures must be verified with the manufacturer.
Sensors and monitoring with CleanCityManager
The compactor increases usable capacity, while monitoring helps plan collections. CleanCityManager is the cloud platform associated with WasteMate. Sensors can transmit fill level, battery status, solar energy production and number of deposits; GPS links data to location. Operators access information via portal or app, receive email notifications and export history. [4]
This information helps identify points that need more frequent service, observe peaks and check emptying thresholds. The platform does not replace shift planning: it provides data to update it. Alerts must however be integrated into operator procedures and followed by timely intervention.
Where WasteMate units have been installed
The sources reviewed document installations and trials in several countries. It is important to distinguish bins actually placed in a city, temporary trials and framework supply agreements. These pieces of evidence cannot be added together as if they represented a single number of installed units.
Albignasego, Italia
One of the first Italian cases concerns Albignasego, in the province of Padua. In March 2021 the manufacturer reported installation of the first WasteMate units in the municipality's central square through the Italian distributor at the time, Spazio Verde. An in-depth article published by GSA Igiene Urbana in the October–December 2021 issue describes three containers for plastic, paper and residual waste, placed at a busy spot also used by an ice-cream parlour, a kiosk and evening events. [5][6]
The magazine reports data attributed to the monitoring software: 141 days of service, 5,922 deposits, 138 compaction cycles, 10 emptyings and 70% average fill at emptying. GSA indicates an average frequency of 14 days, compared with 2–3 days for nearby conventional bins. It is an interesting case study but not generalisable: the publication does not describe an independent protocol or all comparison parameters. [6]
Bari, Italia
In Bari WasteMate was trialled from 10 March to 22 June 2022 in the centre of Bari, at the junction with corso Vittorio Emanuele. The 93-day trial ended with removal of the container at the end of the loan agreement. La Repubblica, citing statements by the municipal environment councillor, reported that the bin was emptied eight times and that the system recorded 4,458 openings and 263 compaction cycles. [7]
The article also reported the administration's intention to purchase another 30 units with European funds. That is a programme announced at the end of the trial, not confirmation that the purchase was completed. The case concerns a central commercial street, where pedestrian flow makes bin availability important.
Perugia, Italia
In March 2023 Umbria Notizie Web reported the start of a trial of the WasteMate 120 model at Giardini Carducci, in Perugia's historic centre. The report describes a device with a compactor powered by a photovoltaic panel, fill sensor, remote connection and GPS. It also states that an LED indicates container status and that, when maximum level is reached, opening can be disabled. The source documents the start of the trial, not its final outcome or whether the equipment remained in place. [8]
Albufeira, Keila e Mora
The manufacturer documents several installations outside Italy as well. In Albufeira, Portugal, solar bins were installed on 16 July 2021 in Praça dos Pescadores in the city centre, on Avenida Sá Carneiro and near the town hall. The announcement attributes the purchase to the municipality, via distributor Hidromaster. [9]
In Keila, Estonia, the manufacturer reports two WasteMate units side by side: one for organic waste and one for recyclable materials. In Mora, Sweden, distributor Irec installed bins at several points in the city. These are references published by the manufacturer, useful for documenting use in different contexts but not equivalent to an independent performance assessment. [10][11]
Stockholm: a framework agreement, not 550 confirmed installations
The manufacturer also reported that the city of Stockholm had signed with Irec Svenska AB a framework agreement with an initial two-year term, renewable, covering 550 WasteMate units. The figure relates to the size of the supply agreement and does not certify that all 550 units were installed. It is therefore correct to cite it as a procurement initiative, not as the number of bins actually on the ground. [12]
What benefits municipalities and operators can gain
The first potential benefit is reducing emptying frequency at points where conventional bins fill quickly. The compactor increases usable capacity and the sensor helps identify when to intervene. If alerts are handled correctly, the service can cut unnecessary visits and keep the container available longer.
Monitoring can also help prevent overflow by prioritising squares, parks, stations and tourist areas. It does not remove every risk: sudden peaks, faults, connection problems or operator delays can still lead to saturation.
Solar power avoids a fixed electrical connection on outdoor versions. Before installation, however, exposure to light, shading, environmental conditions and energy requirements must be checked. Historical data can finally highlight the busiest points and peaks linked to public holidays or events.
What to assess before installation
The choice should start with mapping collection points. Fill levels, emptying frequency, peak times, overflows and waste types must be recorded for an adequate period. This makes it possible to understand whether the problem lies in capacity, location or shift organisation.
Compatibility with collected fractions and the emptying process must then be verified. Staff must be able to remove and replace the wheeled bin safely and with compatible vehicles. The operating plan must clarify who receives alerts, who intervenes and who maintains the compactor, battery, sensors and connection.
Cost should be assessed over the life cycle: beyond purchase, consider installation, support, any software fees, spare parts and batteries. A measurable trial can compare emptyings, operator time, overflows and operational continuity.
A useful technology when applied at the right points
WasteMate does not replace street collection: it is a targeted solution for places where compaction and monitoring can address frequent emptying. Documented cases show installations and trials in squares and central areas, but do not provide a generalisable measure of savings.
For a municipality, the initial question is which points require frequent intervention and why. A trial in high-traffic areas can measure emptyings, overflows, working time and device continuity. The outcome will depend on site choice, waste compatibility and operational use of the data.
Frequently asked questions
How does a WasteMate bin work?
An electric linear compactor reduces the volume of waste inside a wheeled bin. On outdoor versions the device uses a solar panel and a battery; sensors and GPS send information to CleanCityManager.
Where have WasteMate units been installed?
The references reviewed document installations or trials in Albignasego, Bari and Perugia in Italy, in Albufeira in Portugal, in Keila in Estonia and in Mora in Sweden. For Stockholm a framework agreement covering 550 units was announced, which is not the same as 550 confirmed installations.
How much does WasteMate 120 compact?
The manufacturer's data sheet states above 5:1 for general waste and above 8:1 for fast-food waste. The figures are declared technical references and depend on the material deposited and operating conditions.
Does WasteMate work without an electrical connection?
The outdoor version uses a solar panel and a battery. The manufacturer also offers indoor configurations powered from the mains.
Sources
Traflux, “The WasteMate smart bin becomes 100% Traflux”, 5 November 2025.
WasteMates / Traflux, “WasteMate 120”, product sheet and technical specifications.
WasteMates / Traflux, “WasteMate 240”, product sheet and technical specifications.
WasteMates / Traflux, “CleanCityManager”.
WasteMates / Traflux, “Our smart waste bins in Albignasego in Italy”, 9 March 2021.
WasteMates / Traflux, “Albufeira chooses our smart Waste bins”, 28 September 2021.
WasteMates / Traflux, “WasteMates for Keila in Estonia”, 30 September 2021.
WasteMates / Traflux, “Hej! WasteMates in beautiful Mora”, 22 March 2021.

