Smart collection: how fill-level sensors can change collection rounds
From fill level to fleet planning: European cities are testing data-driven collection. Technology pays off when measurements drive operations, not when they only feed a dashboard.

Article contents
The problem with routes that never change
A bin can be nearly empty in the morning and close to capacity by afternoon. A container near a station, market or park can behave very differently from one on a residential street. Yet in many services the emptying schedule still follows fixed days and routes: the vehicle visits every point on the list, even when some do not yet need service.
The fixed model is easy to organise, but it struggles with variation across places, days of the week, seasons and events. At some points crews pass when containers are still barely full; elsewhere service arrives late and overflows or emergency collections follow.
Smart collection tries to reduce this imbalance. Sensors fitted in containers detect fill level and send data to a platform. The operator can use that information to decide which points to serve, when to intervene and which route to assign. It does not mean scrapping every timetable or handing everything to an algorithm: it means making scheduling more flexible and closer to real use.
For European cases on compaction, sensors and fleet integration, seesmart bins: how European cities are rethinking waste collection.
What a fill-level sensor measures
The most common systems use volumetric sensors, often ultrasonic, mounted at the top of the container and aimed at the waste. By measuring distance to the surface, the device estimates how full the container is. The reading is linked to the container ID and location, then sent over a communications network to a central platform.
Data can be expressed as a fill percentage. Depending on the solution, the device transmits at regular intervals or when it detects a significant change. Read frequency, connectivity, battery life and accuracy should be checked in the technical specification: not all sensors behave the same way.
Level is not a perfect measure of waste quantity. The surface can be uneven; cardboard and bags can skew readings; material can settle or compact without an emptying having taken place. A study based on real data from Portuguese containers observed level changes also linked to settlement. Readings should therefore be interpreted over time and compared with records from field staff.
From data to collection round
The full process has several steps: the sensor records level, the network transfers the measurement, the platform maps the data, software sets priorities and the service manager approves or adjusts the plan. The driver receives the route and logs the emptying outcome. That information feeds history and improves later forecasting.
An advanced system does not look only at fill percentage. It can account for how fast a container fills, days of the week, location, waste stream, vehicle capacity, traffic, access times and maximum service intervals. Priority for a street bin in a tourist area may differ from a glass bell or an organic-waste container.
Here lies the difference between monitoring and automation. A map showing containers at 30, 70 or 95 per cent adds visibility. To really change cost and service quality, information must affect the decision: include a point on the round, defer it, bring it forward or send a crew for a critical case. Rules must remain understandable and under operator control.
European cities moving to data-driven collection
Corfù: containers and vehicles connected
In Corfù the system described by Smart Cities Marketplace links telematics on 1,000 containers and 50 municipal vehicles. Data support organisation of the different streams and vehicle GPS feeds a citizen information service. The local municipality plan also provides for monitoring position, fill level and status of containers and a central platform for route planning.
Praga: from pilot project to routine operations
In Prague Smart Waste Collection started with a twelve-month test and 420 sensors on separate-collection containers, mainly underground. After the pilot the service entered routine operations; Smart Prague reports that the network exceeded 7,000 sensors. The platform supports planning and detects abnormal conditions such as fires or blockages.
Sunderland: sensors on existing containers
In Sunderland more than 190 retrofit sensors were installed on existing street bins, from the centre to the seafront. The devices detect fill level and temperature changes, also useful for spotting possible fires. The city presents predictive planning and route optimisation as future developments, not as results already delivered. The case shows monitoring can start without replacing containers.
Hürth: results reported by the municipality
In Hürth ultrasonic sensors transmit bin levels to municipal services; a platform developed with dataMatters suggests vehicle routes. On 30 January 2026 the municipality reported that out of about 900 public bins, 200 were already smart and another 50 were planned. The same announcement attributed to the system an approximate 20% reduction in costs and 30% reduction in CO₂ emissions.
These are results declared by the administration for that project, not percentages that transfer to other municipalities. Their meaning depends on the comparison period and which costs were counted.
Montana and Cascais: using data to change scheduling
The EIT Urban Mobility ROSE project addresses sensors whose data never reach scheduling. In Montana, Bulgaria, the system processed data from 80 containers and generated plans according to fill profiles and geographic groups. EIT reports, on the routes analysed, a 10.2% reduction in weekly distance, from 173.03 to 155.36 kilometres. In Cascais results were more modest and varied by route.
The figures relate to pilots and analysed routes; they are not a promise of savings that generalises everywhere. They do confirm, however, that benefit depends on operational use of the data.
Possible benefits and conditions to achieve them
Integrated planning can cut visits to nearly empty containers, limit exceptional trips and spread work more evenly. Fewer kilometres and stops can reduce fuel use and vehicle wear, freeing time for points that genuinely need service.
Identifying critical containers can improve street appearance in tourist areas, parks, markets and stations. History also helps spot points that fill early and revisit container location or capacity.
Potential must not be confused with a guaranteed outcome. Cutting collection passes can worsen service if the threshold is set wrong, if a forecast underestimates a usage peak or if the route ignores real constraints. The 2024 study by Morais and co-authors shows the trade-off between efficiency and overflow risk: a plan can increase tonnage collected per kilometre but must keep an acceptable service level.
You do not necessarily need a sensor on every container
Device, connectivity, licence and maintenance costs can make full coverage of a large network expensive. A scientific review on route planning stresses that choosing where to install sensors is a design question in its own right. In some contexts a representative sample or a selection of priority containers may suffice; in others broader coverage is needed.
A first project can focus on containers with the most overflows, high-traffic points, tourist areas, markets or locations with strong seasonal variation. Deposit history and operator observations help select sites. After operational value is confirmed, the network can be extended in stages.
How to set up a measurable project
Start by capturing the current service: routes, kilometres, times, tonnage collected, emptying frequency, exceptional interventions and reports of full containers. This baseline pinpoints inefficiencies and lets you measure the project.
Then select a representative group of containers, checking network coverage, compatibility, protection, battery life, maintenance and data availability. Define thresholds and exceptions, such as maximum intervals within which certain containers must still be emptied.
During the pilot compare the suggested plan with service delivered. Useful indicators include kilometres, working hours, tonnage collected, low-fill visits, overflows, urgent interventions, fuel use and sensor availability. Comparisons must account for seasonality and events.
The specification should include data export, APIs if needed, interoperability, access to history, battery life, support, replacements, radio coverage, security and recurring costs. A closed platform can create supplier lock-in.
Sensors, platforms and smart bins: complementary solutions
Monitoring can be introduced without replacing every container. Retrofit sensors gather information from dumpsters, bell bins, underground or semi-underground containers already in place. A smart compacting bin adds a physical function: it reduces waste volume and can integrate remote monitoring. The central platform links data from different assets and makes them available for planning.
Further reading on Greenport:WasteMate smart compacting bins;urban collection points with ECOBAC and UrBin;public bins in parks and tourist areas.
Distributor pages:;.
The choice can combine sensors at strategic points, compacting containers in high-pressure areas and a platform able to turn information into action. Value is not measured by device count but by the quality of decisions.
Frequently asked questions
Does a sensor automatically change the vehicle route?
Not on its own. The sensor detects and transmits level; a platform processes the data and an operational process turns it into a plan, accounting for service and fleet constraints.
Is it necessary to install sensors on every container?
Not always. Coverage should be designed from container distribution, fill variability, costs and objectives. A pilot can start with the most critical or representative points.
Do sensors guarantee lower costs?
No. They can help reduce unnecessary passes and emergency work, but the outcome depends on data quality and integration with planning. It must be measured against a documented baseline.
Smart collection is an operational project, not a sensor purchase
The cases of Corfù, Praga, Sunderland, Hürth, Montana and Cascais show that smart collection takes different forms, from container retrofit to fleet integration.
For a municipality, the first step is to find where the current timetable produces useless passes or late interventions. A measurable pilot makes it possible to judge whether to extend the system. Technology pays off when it improves concrete indicators without compromising service level. Sensors and algorithms do not replace operators: they give them better information for decisions.
Key sources
Smart Cities Marketplace, Smart Bins and Fleet Management: Corfù.
Municipality of Corfù, Local waste management plan.
Smart Prague, Smart Waste Collection.
Sunderland Smart City, Smart Bin Fill Sensors, 24 October 2024.
Municipality of Hürth, Intelligente Abfallbehälter ausgezeichnet, 30 January 2026.
EIT Urban Mobility Marketplace, Optimising waste collection routes in Montana, Bulgaria.